Showing posts with label sustainable trails. Show all posts
Showing posts with label sustainable trails. Show all posts

2010-10-25

Mountain Biking and Saving the South March Highlands

Click On Images To Enlarge

The Ottawa mountain biking community in recent years has been focused on the South March Highlands Conservation Forest accepting that the rest of the South March Highlands/Kanata Lakes trails will be lost to inevitable urban development.

Personally I am starting to become very hopeful that that will not be so and that at least some, if not all, of the remaining South March Highlands lands and trails will be saved from development. This will provide the potential for the South March Highlands to become a real family destination for mountain biking with trails ranging from true beginner (Greenbelt type) level trails to the advanced trails in the Outback system.

Just last week I rode some of the old "Kanata Lakes" trails between Goulbourn Forced Road and the Hydro Cut and it was quite enjoyable. The addition of these trails back into the system would increase the intermediate (Group D type) level trails in the system.

But where I see real potential is in the land north of the existing Conservation Forest that already has a trail on it that connects to the trails within the existing Conservation Forest and provides a trail all around Heron Pond. This land is currently privately owned but zoned Environmental Protection. The potential I see there is to purposefully build a new sustainable trail network on the land further north where true beginner level trails could be built so that whole families, from Ottawa and beyond could visit, Family members could ride the trails that suit their skill level all from one central trailhead, where toilet facilities could be provided and perhaps a picnic area for families to meet up together mid day.

The same trails that form the basis for a beginner trail system could be used for a flowy race course where races could be held to further promote the South March Highlands as a mountain biking destination.

As is the current practice all these trails would be shared trails open to everyone. The only exception being the race course while actual races were being held.

The current City Council takes the first step to save all of the South March Highlands at one of it's last meetings in mid November. Urge your current councillor to support the Wilkinson-Doucet motion that starts the process of saving all of the South March Highlands. Let us all do what we can to save the South March Highlands from further urban development.

2010-09-21

Trail Building School in the South March Highlands

This past weekend I had the good fortune to attend a trail building school held by the people who invented sustainable trail building and literally wrote the books on it, the International Mountain Bicycling Association's IMBA Canada Trail Care Crew:

Supported by Parks Canada and the Trans Canada Trail (TCT) and directed by the International Mountain Bicycling Association Canada (IMBA Canada), the IMBA Canada Trail Care Crew works with IMBA Canada-affiliated mountain bike clubs, TCT Provincial and Territorial organizations, Parks Canada and other trail user groups. Its mandate is to build new trails, maintain and restore existing trails, participate in solving trail management challenges, and to promote trails in order to improve trail conditions and trail experiences for everyone.

The IMBA Canada Trail Crew is a dynamic two-person team of professional trail builders that will travel throughout Canada year-round.

The work that the crew will do will benefit all types of trail users including hikers, horseback riders, mountain bikers, cross country skiers, snowshoers, bird watchers, and all other outdoor opportunities that use trails.

Source: Parks Canada website
Sustainable trail building is not just about mountain biking, and indeed most MTB trails are shared trails and IMBA has been working with other trail users in providing education and has trained people from the National Capital Commission (NCC) and Parks Canada in sustainable trail building methods. Parks Canada is currently revising their trail building manuals to reflect IMBA guidelines, and the NCC seems to be going through a slow shift in their attitude to mountain biking.

The first thing we learned at trail building school is that water runs downhill, well actually that was the second thing we learned. The first thing we learned was that planning is the most important part of trail building and should have the most time devoted to it. Key points are that all trail users need to be considered in planning a trail and that route design can be key in making a trail sustainable.

This is where the water runs downhill part comes in. One of the biggest factors in sustainable trail building is avoiding erosion so that designing a trail so that water runs off it rather than along it is key, and much of what we learned had to do with the degree of incline and slope of a trail. The bench cut method is one way of doing that. Some of the things we learned are described here.

Other factors in designing trails include keeping them away from fragile habitats of endangered species, the Blandings Turtle was mentioned, indicating that the Trail Care Crew was familiar with the SMH situation.

During the trail building school we got to meet many new people and learn a lot of new information, some of it not directly related to trail building techniques, such as the fact that OMBA has been given permission by the City to post signs on the SMH trails to help bikers and hikers know where they are and find their way out. I expect the signs will be in place by next spring. I also learned that the City of Ottawa's draft trail plan for the South March Highlands, with its inappropriate trail closures and denaturalization of trails, is apparently dead. Hopefully it will be back to the drawing board with proper consultations with the public and experts in trail design and building.

We spent the morning in the classroom and the afternoon in the field building a new trail, actually a re-route, in the South March Highlands.

Photos courtesy of David N of OMBA

In The Classroom


The Crew


Hiking In


The Route Is Flagged


Briefing From The Expert


Raking The Path


Bench Cut


Rock Work


The Finished Trail


Restoring The Old Trail


More photos of trail building school are available here.

Trail building school was sponsored by the Ottawa Mountain Bike Association (OMBA).

2009-05-27

The Joy of Undocumented Trails

On the weekend we were hiking near the Lime Kiln and came across a trail that I was unaware of. We had skied or snowshoed along this route but thought it was just a winter route. Both ends of it are fairly well hidden so it was a fluke that we found it without tracks in the snow.

That, and the fact that I was exploring some other undocumented trails behind Stittsville last week, got me thinking about undocumented trails.

So what are undocumented trails. Well the simplest definition is trails without maps, or at least without official maps.

An internet search could not find any maps of, or references to, the Stittsville trails that I explored so I feel confident in considering them to be undocumented.

The trail near the Lime Kiln fits that description as it is not on the NCC official trail map. Neither is the one kilometre technical trail that is known to mountain bikers as the Lime Kiln Trail, although it was on an earlier version of the NCC map as an unnamed trail. The NCC designates the wide trail from parking lot P10 to Richmond Road as the “Lime Kiln Trail”.

Personally, one of the biggest joys of undocumented trails, besides riding an unknown trail for the first time and not knowing what I will find, is documenting them. I have always had a thing about maps and the ability to actually become a map maker is really rewarding. So I have spent the last few biking seasons starting to map all the western greenbelt trails. It is currently a work in progress. I plan to move my maps to a new home and add trail descriptions and eventually photographs. Watch for an announcement in the next few weeks.

Undocumented trails tend to be unofficial trails that were not planned, or built by, any official entity but created by trail users.

An architect once proposed that when designing open spaces pathways should not be planned in advance. Rather the space should be left open for users to walk across and the users of the space will create paths where they are best suited. The designers would then build the pathways were the users have walked.

In many ways that principle can be applied to trails. Often the users know best. Certainly the greenbelt is full of unofficial user created trails and these are some of the best trails in the system. Surprisingly the National Capital Commission (NCC), known for being overly bureaucratic, does not appear to have made any effort to close such trails, even placing signposts on some in the Old Quarry area.

However, the City of Ottawa, during the South March Highlands (SMH) Management Plan process, has proposed that many of the existing “unofficial” trails in the SMH be closed as part of the process of legitimizing the trail system. As far as I know, none of the closures are for specific environmental reasons but more a matter of rationalizing the trail system.

If past experience is any indicator I think it will be difficult to convince users to stop using trails they have used for years. I suspect the city hopes that user groups that have been involved in the SMH management plan process will try to convince their members not to use the closed trails. It remains to be seen how they will respond. So far it appears that everyone, including the city, consultants and user groups have been acting in good faith during this process and I believe the city hopes users groups will feel they have enough “ownership” of the result to support it. The fact is that most trail users, whether they are hikers, mountain bikers, or cross country skiers do not belong to organized groups, and those that do are not necessarily going to do their groups bidding.

Perhaps the best policy for the city to pursue would be to leave the trail system the way it has naturally evolved except for measures to address specific environmental concerns or improve the sustainability of the trail system.

2008-05-12

Submission re: South March Highlands Conservation Forest Management Plan

click on map to enlarge

I am a lifelong environmentalist and outdoorsperson who hikes, mountain bikes, skis and snowshoes in the South March Highlands.

My first comments have to do with the public consultation process.

I was very pleased to see the full colour maps of the protected area at the open house presentation and to learn that more lands than I expected are being protected. In reviewing the maps it appears that more of the existing trails than expected may be included in the protected area.

Afterwards, I immediately went to the City of Ottawa website to see if I could review the maps and other documentation. However, as is usual, whenever I go to the City of Website to look for planning or development information I find it to be woefully inadequate.

It would be very useful if the public could access more details and background information on the City of Ottawa website in order to make better informed comments and suggestions.

One of the things that would be most useful to me in assessing the proposal and making suggestions regarding the trail network would be to see a map of the protected area with the existing trails overlaid. There are numerous trail maps available and I am appending a few that I have acquired to this document.

Before dealing with the trail network I want to address some real concerns I have about the impact of Terry Fox Drive on the conservation forest. Terry Fox Drive is an urban road that serves urban development. It should be routed through urban development land, not through land classified as rural conservation forest. To the extent that it has to cross the western portion of the protected land it should do so using as little protected land as possible.

Terry Fox Drive should absolutely not be bisecting the rural conservation forest in the way that it does. If the city is unwilling or unable to stand up to the land developers and put the road through urban development lands, the least it should do is route it along the southeastern edge of the conservation forest and not bisect the rural conservation forest.

The people of Kanata and Ottawa deserve at least an explanation as to why Terry Fox Drive is being routed the way that it is.

The rest of my comments will deal with the trail network.

As an environmentalist and serious hiker and mountain biker my first and primary concern is that the trails be kept in their natural rugged state and be retained as natural surface single track trails.

I understand that as a result of the environmental assessment process some trail rationalization may need to be done - some trails may require work to make them sustainable and some may need to be rerouted. I have no objection to improving the sustainability of the trail network as long as the network as a whole is not degraded. There may even be opportunities to build new trails for environmental reasons or to allow trail users to enjoy natural features in the area.

In particular, one trail known as “Outback”, is very long and can take up to four hours or more to hike. At several points that trail comes very close to adjoining trails. Making a link at one or more of those spots would allow hikers, who otherwise might not hike the whole trail all at once, to hike part of it at a time. Of course this would depend on whether there are environmentally suitable routes to make the links. This would also provide a faster exit for people injured on the trail and would provide faster access for emergency personnel, particularly in the winter when the cold is an added factor

In examining the map of the protected area we can see that it almost forms a circle providing the possibility of a large loop of interconnecting trails. This would require a link from the lands deeded to the City by KNL in the southeast end of the network to Trillium Forest in the northeast end of the network. Including a pathway between those two sections in the subdivision agreement would enhance the trail network in the protected area.

There has also been the possibility of wheelchair access pathways suggested. Despite the potential benefits of this, I do not wish to see the natural ruggedness and wilderness-like nature of the protected area compromised. One possibility is to build such a pathway around the “Beaver Pond”. This would also provide a place for casual walkers to enjoy the forest without ending up on the rugged natural trails in their high heels or sandals.

I understand the management plan will deal with the appropriate location of trailheads and parking facilities. I hope this will be done in such a way that natural features are not compromised. I would also suggest providing outhouses at the parking lots, as is done by the National Capital Commission at many of its parking lots in the greenbelt trail system.

Another issue that has been addressed by many trail users is the lack of signage, particularly due to the complexity of the trail system and the possibility of people getting lost. I trust this issue will be addressed in a way that detracts the least from the naturalness of the trails.

The last issue I want to address is public education. The official recognition of the South March Highlands Conservation Forest as a human-powered recreation area will make possible a more extensive public education program on responsible trail use. This has been something that the organized mountain biking community (OMBA) has been pursuing vigorously among its membership. However their membership does not include all trail users, and does not even include all mountain bikers. I would like to see the City fund an extensive public education program on responsible trail usage in co-operation with all trail user groups.

A good place to start in developing responsible trail use guidelines would be the IMBA Rules of the Trail.

Signage at the trail heads should include large trail maps on the signs along with responsible trail use guidelines. As well pamphlets with a map of the trails and the guidelines should be available.

I would also direct you to my previous comments on the South March Highlands Management Plan, “The South March Highlands - Kanata's Outdoor Wonderland”.

Maps of the South March Highlands and Kanata Lakes Trails

click on maps to enlarge





This has been sent to the South March Highlands Conservation Forest Management Plan project manager and the four councillors representing Kanata on Ottawa City Council.

2008-04-14

South March Highlands Management Plan Open House April 30

In November 2007 the Fifth Column discussed the South March Highlands Management Plan and the suggestion by the Kanata Environmental Network (KEN) that public use of the lands be kept to the periphery. Fortunately that view is not shared by any other environmental or user group, nor is it shared by the City of Ottawa.

If you want to know what is going on with the plans for the South March Highlands and want to have your say the public consultation process is about to begin. The first public meeting will be an open house from 7:00 to 9:00 PM at the Kanata Old Town Hall on March Road, near Klondike Road, on Wednesday April 30, 2008. This will be a relatively informal drop-in format as the consultants (Douglas and Ruhland Associates, landscape architects) “would rather engage and talk directly to those interested than have a formal presentation at this point in the process”.

Click here for a link to the Terms of Reference for the South March Highlands Management Plan, which includes the following information (extracts):

These forest lands include some of the most significant ecological features and functions within the City of Ottawa. It is the most ecologically diverse landscape in the City, overlies a section of the Canadian Shield and provides an exceptional natural environment experience. It also provides significant cultural and recreational resources with extensive use (hiking/walking and mountain biking being the two most prominent) by the immediate community, the larger City population, and in the case of some activities such as Mountain Biking, people living outside of the City.

Several issues have emerged in the area:

· The area is well known as a mountain biking and hiking/walking destination and at present, an extensive informal trail network has developed. There is the possibility that the location of certain sections of trail and/or the construction techniques that were used to build the trails are not necessarily consistent with the protection of natural values in the area. At the same time significant volunteer efforts have been made in recent years to implement lower impact trail construction techniques within the City owned conservation forest.

· Potential conflicts between users (nature appreciation, casual walkers, mountain bikers, hikers).

· Increased indirect impacts (edge effects, loss of interior habitat and connectivity ecological support systems) and use impacts as designated development areas build-out.

· There is no interpretative plan or efforts to direct the current range of users to protect or take advantage of features in the highlands.

· There is a lack of formal access or trail-head provisions.

· The need for a trail section or access for physically challenged residents has been raised.

· Limited existing tools to manage the form and intensity of recreational or other use in the area.

Objectives:

The overall objective is to design a management strategy that will provide long-term management direction for a 20 year period which provides for protection of the significant ecological features and functions of the South March Highlands while allowing users to experience the area through appropriate recreational activities in a way which is both manageable and sustainable in terms of the City’s, and stakeholder and user group resources.

The planning process will include:

· Participation in a project initiation open house to introduce the project to the community.

· Identification of use and management objectives through a stakeholder workshop and/or other consultation approaches to gain stakeholder input.

· Identification of opportunities for appropriate recreational use (open air recreation including hiking and biking, education, nature appreciation) and concerns related to inappropriate use and strategies to mitigate the effects of recreational use…

· Review and incorporation of best practices for low impact recreational use/trail development and management of near urban/urban natural features

· Develop detailed management recommendations

o Management of uses – where different uses should occur, how to control impacts.

o Management of future stressors (adjacent development, climate trends, invasive species)

o Recommendations related to connectivity to other landscape features within and outside the forest; and longer term strategic objectives for preservation of ecological integrity such as additions to the forest.

· Conceptual plan for infrastructure (recommendations for trail location, trail treatment, access).

o Trail location options (including an accessible trail)

o Trail treatment and design options

o Use management (signage, etc.)

o Access and potential trail head/ parking locations

o Interpretive resources (e.g. kiosk).
The Fifth Column hopes to see you all at the open house on April 30.

2007-11-16

The South March Highlands - Kanata’s Outdoor Wonderland

I want to preface this by stating that I am a hiker and mountain biker, as well as a cross-country skier, but primarily I am an environmentalist.

On November 10, 2000 the Regional Municipality of Ottawa-Carleton announced the purchase of 556 acres of the South March Highlands for $1.6 million at the urging of Kanata Regional councilor Alex Munter who has stated “his biggest achievement would be putting South March Highland into public ownership to keep it protected.“

My attempt to find anything about the plans for the South March Highlands on the City of Ottawa website have been unsuccessful. All I could find were references to the fact that a plan should be drawn up.

However my own sources have confirmed that the process has begun with the city meeting with stakeholders and conducting another environmental assessment on the lands. I understand public meetings will be announced shortly.

Having heard rumours that some “environmentalists” wanted to restrict public access and trails to the periphery of the area I contacted the Kanata Environmental Network who provided this response:

“KEN has a representative attending the City meetings concerning the South March Highlands. The periphery approach is consistent with the environmental studies that Dan Brunton did over 20 years ago. There will be a new environmental assessment done in the next year and it may recommend keeping all human traffic on the edges. KEN is in favour of this approach. There is no other way to protect the heronry and multiple rare plant species in the highlands. KEN's stance reflects Brunton's recommendations until an update becomes available.”

This will come as a shock to the local community associations and activists who used Dan Brunton’s research in their fight to save the adjoining KNL lands from development and protect the trail network. They obviously have a different interpretation of Brunton’s position.

The fact is that this is urban parkland, not wilderness. It is surrounded by roads and the southern boundary is going to be a major roadway - Terry Fox Drive. Treating this land as wilderness with no interior public access simply does not make sense. One only needs to look at the response to KNL’s development proposals to know the public wants access to these lands.

And of course the trails are there and have existed for years and are being used by residents from all over Ottawa.

People can be a great threat to the environment, the biggest impact being from development - bulldozing and paving it over, blasting and replacing forests and meadows with parking lots and buildings.

On the other hand people hiking responsibly through the forest has no greater impact than deer or bears running through the forest, particularly when they are on a controlled trail system. The same applies to mountain biking where the scientific evidence indicates that hikers and mountain bikers and hikers have equivalent impacts on trails. See for example the reviews done by the International Mountain Bicycling Association and the New Zealand Department of Conservation.

The majority of outdoorspersons considers themselves to be, and indeed are, environmentalists. The best way to raise environmental awareness is by getting people out into the environment, enjoying it and learning of it’s importance and the need to protect it. That is where the environmentalists that we need to fight the real threats to the environment - development and habitat destruction, are born.

Getting people out into the environment, onto the lakes and rivers and into the forests builds healthy lifestyles, and healthy lifestyles improve our health and reduces our health care costs. This is important at a time when obesity, and childhood obesity in particular, is at epidemic levels. We need natural spaces and trails to teach our children the benefits and enjoyment that can be had in the great outdoors. Kanata is fortunate that we have a population that celebrates healthy lifestyles and rises up to challenge those that want to take our natural spaces and trails away from us.

Young people need the type of challenges the outdoors can provide as an alternative to spending their time a sedentary lifestyle centered on electronic devices, or other even worse but seemingly exciting activities, like gangs and drugs. Youth can be attracted to these things by the very risks we want to protect them from. Outdoors activities such as rock climbing and mountain biking can provide exciting healthy risks that build character and a healthy body.

The South March Highlands is an ideal location for the people of Kanata, young and old, to discover and enjoy a healthy outdoor lifestyle.

Fortunately we already have an environmentally friendly trail system in the South March Highlands, with natural, rugged, single track trails that have minimal environmental impact. These are the types of trails that hikers and mountain bikers love. The trail system is currently unofficially maintained by the Ottawa Mountain Bike Association according to the International Mountain Bicycling Association (IMBA) sustainable trail building standards which keeps the trails as natural as possible with some rock armouring used to raise low wet areas and some bridges over wet areas.

So what should the South March Highlands Management Plan propose for the existing trail system.

The trail system should be reviewed in light of the findings of the new environmental assessment, and in particular the identification of environmentally sensitive areas. It should also be reviewed in light of IMBA’s sustainable trail standards. This review would determine if any trail sections need to be rebuilt, closed or re-routed, as well as identifying possible additional trail routes.

Existing and new trails should be designed and maintained in as natural a state as possible, no widening, flattening, or paving should be allowed.

The South March Highlands belongs to all of us. The trails should be open to all users, with the exception of motorized vehicles, including snowmobiles.

In the summer we already have seen that the trails function exceedingly well as shared trails and they have the potential to become a model shared use trail system.

In the winter these rugged trails are ideal for snowshoeing, as well as mountain biking. Cross country skiers should also be welcome but these natural trails should not be altered into wide flat ski trails. There are lots of good wide flat ski trails available for skiing. These trails provide an excellent alternative for other trail users to avoid conflicts with skiers on the cross country ski trails.

The final, but perhaps most important part of the plan, should be public education on environmentally friendly and sustainable trail use, including respect for other trail users - share the trail. The education campaign should stress that trail users should stay on the designated trails. As well it should encourage trail users to avoid wet muddy trails but advise them to use the centre of the trail, not go alongside and widen it, if they do need to go through wet muddy sections. A good place to start with trail education are the IMBA Rules of the Trail

The residents of Kanata fought a valiant fight to try to protect the environmental lands and trail system within the KNL development lands, We still have the South March Highlands. It is time to build a plan that allows us to enjoy this environmental jewel in a responsible way that gets more people out enjoying the great outdoors and protects the environment.