Showing posts with label mountain biking. Show all posts
Showing posts with label mountain biking. Show all posts

2010-02-08

Winter Biking

Well, I have actually got into the winter biking thing and pedalled over 230 km since December on the winter bike with the studded tires.

The Winter Bike

Most of my riding is around the communities of Bridlewood and Glen Cairn on the neighbourhood collector roads which are usually always clear. Lately due to the lack of snow even the side streets have been easily rideable.

The cold has been somewhat of a challenge, as biking adds about an extra 15 km/hr wind chill, so my rides have typically been limited to 15-20 kilometres.

I have to say that I am quite pleased and somewhat surprised at how well the cheap Supercycle performs, even the gears are shifting well despite the cold and slush, although I have been bringing the bike inside every week or so to clean and lube. I've been using pretty heavy lube - lithium grease and chain saw bar oil, which I am pretty sure would get the bike clogged up with gunk from the trails in the summer, but it seems to help protect from the salt and slush in the winter.

The studded tires are also fantastic. When I first started riding them I would look for every piece of ice I could to test them on. The other day I was over on some new subdivision roads where they have not been working in the winter and found lots of ice to tool around on and it was like riding on bare pavement.

The only problem with the cheap bike is the lack of suspension on some of the hard packed walking trails that are not cleared (gravel rather than pavement underneath) and even though they don't look so bad you can really feel the bumpiness without suspension so I don't usually last very long on those sections.

The actual forest trails are much smoother than that, and due to the recent trail conditions I was actually able to ride a few times on the Old Quarry Trail where the snow is packed enough that I just rode along top without sinking in, and wide enough I could ride alongside the ski tracks where there were any. Even people walking the trails are not sinking in. Other trail users seemed more amused than anything and I often stopped to chat with them. One asked me if I was patrolling the trail, probably because I had my yellow reflective vest on that I wear to be certain to be seen in traffic.

A Typical Ride on The Winter Bike (click to enlarge)

I am still looking forward to the new biking season and getting out on the good bikes but the winter bike is at least keeping me pedalling and it will be something to ride in the spring until they stop dumping bike-killing salt on the roads and paths.

2009-12-09

Looking Forward to Next Biking Season

The Season in Review

As the snow falls and the salt trucks prepare to dump their loads of corroding crap on the roads and paths it is time for my season end report. I did my first below freezing ride Sunday and it was not too bad. This is the latest in the year I have ridden in recent history and I just might not stop yet.

Overall I have ridden 2684 kilometres (175 hours) this year, 508 (45) on the mountain bike and 2176 (130) on the hybrid.

My season had a poor start though with my riding only the 30 km route in the CN Cycle (formerly Tour Nortel) and dropping out of the first Ottawa Mountain Bike Association (OMBA) South March Highlands (SMH) Group Ride and never getting back into them. My first attempt at organizing a Greenbelt group ride also proved unsuccessful, hopefully just due to poor timing.

CN Cycle for CHEO

Ottawa Mountain Bike Association (OMBA)

But things did pick up and I got into the swing of things. The early part of the season saw a lot of rain and muddy trails so I spent a lot of time on the hybrid putting the kilometres on. When the trails dried up I did a lot of Greenbelt riding and ventured into the South March Highlands. I made a point of getting out on the old Kanata Lakes Trails to ride them before we lose them, as well as riding the upgraded Rockhopper Trail. I also had an interesting ride riding along the new Terry Fox Road right of way, after it was bulldozed for surveying.

Terry Fox Extension Caterpillar Track

Near end of the season I tried out a night group ride in the Greenbelt, where I managed to lose my helmet light. But that did get me back interested in night riding and the search for a new light began, and just as I decided on a new light to buy my light was surprisingly found on the trail by another rider. But it was too late, I had already decided to buy the better replacement light. That is until news of a new better and cheaper alternative was posted on the OMBA website. That is now my new light of choice, I'm just waiting for some trail reports from other riders, who are buying this light in droves, before I purchase it, likely in the spring.

OMBA :: Topic::Latest in lights....

My wife has decided that snowshoeing into work from Kanata to Stittsville just takes too long in the morning so we got ourselves a winter bike - a $100 Supercycle with $200 worth of studded tires for her to ride the two days a week she goes to Stittsville. So I might take it out sometimes during the rest of the week, as long as the weather does not get too cold - but that's a big "might" right now.

Another experience I had this summer was discovering the undocumented Stittsville Trails. And I use the term discover here in it's true meaning, just as the early explorers did - I found something that I didn't know existed but that others knew about and have used for long periods of time. It was still fun exploring them and mapping the trails to add to my collection of GPS Trail Maps.

Stittsville Trails

GPS Trail Maps Website

This was part of the impetus to reorganize and redo my trail maps and move them to a new home. The site can be found here:

Richard's GPS Trail Maps

It started with establishing a new site on blogspot and deciding to add trail descriptions as well as annotating the actual maps with more information. That led to adding photos and actually redoing some of the maps. I then decided to make the GPS data available which meant creating GPX data from the Google Earth kmz files for my earlier maps as I did not save the GPS files for them, as well as cleaning up the GPX files by removing overlapping tracks as much as possible. The project just sort of mushroomed, including photo sessions especially for the project.

And now I am looking at adding additional map views from different maps and satellite images, possibly over the winter, since I discovered another mapping program to add to my collection.

OMBA :: Topic::TopoFusion

Mountain Biking Advocacy

I was also busy this season blogging and making submissions to the City of Ottawa and the National Capital Commission on Mountain Biking Issues, in particular the South March Highlands Management Plan and the Greenbelt Master Plan Review.

My blog postings and submissions can be found here:

THE FIFTH COLUMN: Greenbelt Master Plan Review

THE FIFTH COLUMN: South March Highlands Management Plan

I will be presenting further submissions on both of these issues.

Other Mountain Biking News

This season saw OMBA's catweaver formalize her after school rides into MTBCAT - Mountain Biking Children and Teens to provide opportunities for children and teen to experience adventure through mountain biking and other outdoor activities. MTBCAT believes every child deserves the opportunity to explore the great outdoors so they provide the equipment. This is a great program that not only gets children interested in a great sport but also brings them into contact with nature, two things that many children today are missing. The program provides proper equipment to youths who otherwise would not have access to proper mountain bikes to learn on, as well as teaching them bicycle maintenance and repair skills.

Mountain Biking Children And Teens

MTBCAT and OMBA sponsored this years International Take a Kid Mountain Biking Day on September 26th.

This season also saw the announcement of the Joyride 150 Indoor Bike Park in the Greater Toronto Area, much closer to Ottawa than Ray's in the United States.

Joyride 150

As well there was the announcement of the closure of the MTB website a silvertouch and it's replacement by PrivateerMTB.

PrivateerMTB

Talking about MTB websites, the grandaddy of them all, MTB Kanata, is still around but struggling. Check it out.

mtbkanata.com

Looking Forward to Next Season


So here I am already thinking ahead to the spring and next biking season.

First thing on my mind is keeping and getting into shape and doing enough early season training to complete the full 70 km route in the CN Cycle for CHEO.

I also hope to get back into the OMBA SMH Group Rides as well as do more riding in SMH by myself, including the old Kanata Lakes Trails before they are gone. Maybe this year will be the year to get around to riding Outback again. My hope is to do a nice easy paced beginner group ride of Outback with the pace set by the slowest rider, and just hope it isn't me.

I also expect to do a lot of Greenbelt riding, in particular the mapping of Trail 10 and area near the Ottawa River and Trail 29 and connecting trails at Bruce Pit. I also plan to re-activate my series of weekly Greenbelt Rides rotating through the western Greenbelt Trails, including some night rides.

One ride in particular I have been planning for years is a 40 km marathon Greenbelt Trail ride of the western Greenbelt Trails. Maybe next season. Hopefully.

Finally of course will be lots of hybrid riding when the trails are too wet to ride. This past season I didn't get any real long 100km hybrid rides in, so hopefully next season.

Happy riding to all of you riding throughout the winter and see you on the trails in the spring.

2009-09-24

Winter Trail Conflicts on the Greenbelt Trails

Submission to the National Capital Commission Greenbelt Master Plan Review - Part 2

By Richard W. Woodley, environmentalist, hiker, mountain biker, snowshoer, cross country skier, kayaker

In my previous submission on the Greenbelt Master Plan Review I discussed how well trail sharing amongst the various trail users worked on the Greenbelt trails during the spring, summer and fall.

Unfortunately I cannot say the same about the winter season. The main conflict, of course, is between cross-country skiers who like track set trails and walkers/hikers who walk through the track set trails punching deep holes in them.

Many skiers resent the walkers and many walkers feel they have just as much right to use the trails as the skiers. While I do not believe the conflict will ever be eliminated there may be a way to reduce it.

I believe the solution lies in encouraging the hikers/walkers to use snowshoes and provide dedicated trails for them, or at least publicise the dedicated trails that I just discovered exist as indicated on the official NCC trail map.

I would suggest the NCC, in partnership with snowshoe manufacturers and retailers undertake a snowshoe lending program. The partners would provide the snowshoes and lenders would receive information on where to purchase the snowshoes they are borrowing, as well as information on all the program participants. It only takes about one outing to realize it is a lot easier walking the trails with snowshoes than boots and that they do not punch deep holes in the trails. This will go a long way to reducing the conflict, because even on the ski trails snowshoes do less damage than boots - they may pack down the tracks but they do not punch deep holes in them. However if enough appropriate snowshoe trails are available many of the walkers/hikers may choose to snowshoe on them rather than walk on the ski trails.

In this context, I would also like to address the issue of winter mountain biking. For the last few years, within the South March Highlands, mountain bikers have been creating winter trails by packing the trails down using snowshoes and have demonstrated that snowshoeing and mountain biking are indeed compatible on the same trails. Mountain biking on packed trails simply leaves a track, similar to a cross-country ski track. Indeed it is not practical to mountain bike on trails if you are sinking deep into the snow and creating holes or ruts. So I would suggest that to get the maximum use out of the designated snowshoeing trails that mountain biking also be allowed on them.

I have attached maps of suggested routes for shared snowshoeing and mountain biking trails. I have chosen trails that are less cross-country ski friendly due to their terrain.

It was after creating those maps that I noticed the increased number of snowshoeing designated trails on the on the NCC Greenbelt Trail Map. I was surprised to see Jack Pine designated as snowshoe trail and Trail 11 designated as a ski trail. I think it would be better to designate trails that are less skier friendly as snowshoe trails and the most popular ski trail as ski trails. Although Jack Pine would make an ideal beginner winter mountain biking trail, frankly I do not believe the skiers will stop using Jack Pine. The vast majority probably do not even know of its designation as a snowshoe trail rather than a ski trail.

Encouraging walkers to switch from using boots on ski trails to using snowshoes on snowshoe trails is going to take more than just putting red dots on a chart on the official map that few people actually look at. It is going to require a concerted effort and campaign to encourage snowshoeing on the designated trails, a campaign that should include allowing and encouraging mountain bikers to use the snowshoe trails.

(click on maps to enlarge)



2009-09-10

Richard's GPS Trail Maps Site Completed

I have finally finished updating and moving all my existing GPS Trail Maps to the new site, with photos for all the trails except the Marlborough Forest Roads.

I will be adding more trails to the site as I get them mapped, in particular the Bruce Pit area trails including Trail 29 and the trails near Shirley's Bay, including Trail 10.

Check it out at:

http://gpstrailmaps.blogspot.com/

2009-08-26

Kanata Lakes/South March Highlands Easier Mountain Biking Trails

I received a request to identify the easier Kanata Lakes (KL) and South March Highlands (SMH) trails from a rider who would like to take his wife riding in the area. I am providing the information here in case others may be interested. Of course,“easier” is a matter of personal interpretation.

The trails in this area are known to be some of the most technical in the Ottawa area but there are indeed some relatively easier trails in the system. The trails I am identifying are the ones that the easiest OMBA Group (Group D) would ride during the Thursday evening group rides.


click on map to enlarge

Kanata Lakes Trails

I am going to start with the trails closest to the parking lot on Goulbourn Forced Road (GFR). This is the trail system that will virtually disappear as it is overtaken by urban development. But until the development reaches these trails we will will still have a few years to enjoy them.

The easiest of these trails is a gravel loop that goes from the GFR parking lot, starting at the south end of the parking lot, to the Beaver Pond parking lot and continues to Goulbourn Forced Road.

Also starting at the back of the GFR parking lot are a series of single track dirt and rock trails, including the Lost and Found Trails. These can vary from easy to intermediate level and can be quite enjoyable for beginners to ride. During the wet season sections of these trails can get quite wet, in particular the trail that goes from the gravel portion of the Trillium Trail to Goulbourn Forced Road.

One of the trails that both my wife and I enjoy is the dirt single track section of the Trillium Woods Trail starting on the west side of GFR. Unfortunately it is going to become a compacted gravel/stone dust pathway, unless the draft SMH management plan is changed. It will lead you into the easier parts of the SMH trails, circled in red on the map.

On the other side of the GFR parking lot are the KL trails, including the Marathon Trail and other trails that are very popular for cross-country skiing. Unfortunately almost all of these trails southeast of the Conservation Land Boundary will be lost to development except for a short corridor that will be converted to a compacted gravel/stone dust pathway. For the most part these are beginner-friendly trails.

At the western end of these trails is the hydro cut trail that connects the KL system to the SMH system. After significant rainfalls these section of trail can become very muddy. It will eventually become a hard packed gravel/stone dust pathway.

South March Highlands Trails

You can access these trails from the the corner of Second Line and Klondike Road (K2). The SMH trails follow the IMBA stacked loop system with the trails getting more difficult as you get further into the system.

The trails circled in red on the map are the beginner friendly trails but they do have sections that may require beginners to walk their bikes for short distances. The easiest trails are Fast Out, Rockhopper Junior, Rockhopper Extension and M-Line. Bear Claw is more of an intermediate trail at the moment simply because it is fairly rough, but it is a lot of fun to ride. The draft SMH management plan proposes to convert Bear Claw into a compacted gravel-stone dust pathway. I would also include Rockhopper itself as a beginner friendly trail, since a lot of work has been done in recent years to improve the flow of the trail.

The FB trails, known as Inner and Outer Thigh, circled in dotted red lines on the map could also be described as beginner friendly with a few difficult sections except for the large number of narrow bridges that may intimidate some beginners, but they can be walked over.

click on map to enlarge

2009-05-31

Richard's GPS Trail Maps

My new site for posting my trail maps is up and running and I think it looks good. I have some background information posted plus links to all the existing maps.

I used Blogger's simplest template and I think it's a good fit for the project. It is a work in progress. Eventually all the maps will be moved so there are small versions viewable on the site and clicking on them brings up the full map. I hope to add more annotations to the maps along with trail descriptions and photos, and of course more maps.

Check it out at:

http://gpstrailmaps.blogspot.com/

2009-05-23

Stittsville's Secret Trail System

click on map to enlarge

OK, it may be somewhat presumptuous of me to call it a secret trail system just because I was unaware of it. Actually, I knew there were trails back there as they connected to a trail/pathway that runs along the southwest edge of Stittsville that we ride on our hybrids. I always wondered where they went but I didn't expect them to be as extensive or as interesting.

The first section I checked out was the most southern section of trails. This includes sections that go over open grasslands and are not that interesting but, as anyone who has rode on grass will know, can be hard pedaling.

The most interesting trails went into the forest where some sections were marked with coloured ribbons. Parts of these trails were quite narrow with tree branches going into the trails, somewhat like old abandoned trails, except the ribbons suggest that they are possibly new trails that still need to be completely cleared. I followed the yellow trail till it seemed to disappear, then I noticed red ribbons and thought perhaps they just changed the colour of the ribbon. Later I ran into yellow ribbons again so I think I may just have lost the yellow trail and wandered onto the red trail. However, most of the trails do not have any ribbons or markings.

There are lots of intersecting trails in there. On the map you will notice numbered WayPoints that indicate intersections. If you do not see an intersection on the map it is because I have to go back and ride/map the intersecting trail.

At the northern end of the trail system are a couple of trails that go into areas where there are wooden structures and large 4X8 wood sheets. These look like they may be set up for paintballers to hide behind except that there are no signs of spilled paint, so maybe they are just play forts. It really is great for the neighbourhood kids to live in a small town and be able to go off by themselves and play in the bush. But then, I grew up in what was considered an urban neighbourhood, and we had rocks, and railway tracks, and a creek with quicksand, and even a slag dump to play around unsupervised.

In the middle section is a long trail heading towards Hazeldean Road. Somewhere past WayPoint 13 the trail deteriorates and at one point you realize you are no longer following a trail but are following deer tracks and are in the middle of dense bush struggling with your bike. That is when you do not want your GPS to fail because it is the only thing you have to lead you back to civilization. Luckily it led me to a fence along Hazeldean Road, where fortunately there was enough room under the wire to crawl through and push the bike through.

There really are some interesting features within this system, including a trail that runs along a creek, and a real interesting causeway/bridge over the trail with another alternative narrower more technical/difficult bridge a few feet further along.

There are quite a few sections where I had to walk my bike, not because the trail surface was technical but, to avoid being speared by tree branches growing into the trails. There were also some wet/muddy sections that could do with some trail work, but most of the trail work would consist of cutting back trees and brush along the trails.

This land is outside the urban boundary of Ottawa and from what I can tell from the Ottawa Zoning Map is partly zoned RU (Rural Countryside) and partly EP3 (Environmental Protection). I do not know who owns the land but there is certainly potential for a really fun greenbelt-like trail system here with a little/lot of work.

I hope to publish a complete map of the trail system (ride at your own risk) as it is as soon as I get the opportunity to ride and map all (or most of) the interconnecting trails.

click on map to enlarge

2009-04-07

South March Highlands Management Plan Information Update

The City of Ottawa has finally posted the information presented at the March Open House on it's website. Please note in particular the map of the proposed trail system.

South March Highlands Management Plan Open House Display Boards (March 2009)

2009-03-27

How To Not Close A Trail While Building A Highway Over It – The Vienna Experience

Another in my Austrian Reflections Series.

One of my pet peeves has been the closure of the Queensway pedestrian and bike underpass from the summer of 2007-2009 (don't know if it will open at all this summer) while construction is being carried out on the western portion of the Queensway near Kanata.

They do things differently in Austria. We were on mountain bikes along a trail that followed the Marchfeldkanal on the outskirts of Vienna and came upon the construction of a highway over the trail. As you can see from the photographs nobody felt that there was a need to close the trail and indeed children (with parents) and bikes were explicitly allowed on the trail.

The sign in German translates (according to Google)to “Forbidden to enter the site - Parents are responsible for their children”, which I understand to mean “stay on the trail”.

(click photos to enlarge)








These are some other photos from along the trail.








2009-03-26

Trail Drainage In The Vienna Woods

This is a continuation of my Austrian Reflections Series.

These are photos of a trail drainage system used on mountain bike and hiking trails in the Vienna Woods. The above ground system makes it easier for trail users, or the rain, to clear silt out of the troughs than it would be to clear out culverts under the trail and you can still ride over the troughs..

(click photos to enlarge)







Having been fortunate to hike in the Vienna Woods I will take this opportunity to post some other photos of the mountain bike trails.







2009-03-04

Submission re: South March Highlands Conservation Forest Management Plan Draft Trail Plan

This document is being submitted to the City of Ottawa South March Highlands Conservation Forest Management Plan public consultation process.

If you attended the March 2, 2009 public meeting please let the city know your views on the plan. If you could not attend the meeting become informed and make your views known.

For more information, or to make your views known, please contact:

David Miller
Program Manager, Environmental Sustainability
City of Ottawa
4th floor, 110 Laurier Avenue West
Ottawa, Ontario K1P 1J1
Phone: 613-580-2424, ext. 21447
Fax: 613-580-2459
E-mail: david.miller@ottawa.ca

You may also wish to let your city councillor know about your views.

Contact Information for City Councillors


Introduction

I am a lifelong environmentalist and outdoorsperson who hikes, mountain bikes, skis and snowshoes in the South March Highlands.

In this document “trail” will refer to natural rugged single track trails and “pathway” will refer to wide hard packed gravel-stone dust pathways. As there are no official trail names provided in the plan I will refer to trails according to the names on the Ottawa Mountain Bike Association (OMBA) Trail Map.

Reference Maps (click on maps to enlarge)

Ottawa Mountain Bike Association (OMBA) Trail Map



City of Ottawa Map of Proposed Trail System Annotated by Richard W. Woodley


(unfortunately the city's full colour-coded map of the proposed trails and pathways is not available to the public)


Overall Impressions of the Trail Plan

I have to say that the most important aspects of the plan are that it recognizes the principle of a shared trail system and the legitimacy of mountain biking as an activity on the trails. It also maintains the bulk of the existing trail system.

I do have concerns with some of the public perceptions out there and some calls for separate trail systems. My experience on the trails, whether on my bike or hiking, is that everyone shares the trails well with no problems.

Trillium Woods

The Trillium Woods Trail is currently a naturally rugged trail and a very enjoyable trail for beginner and intermediate level mountain bikers, as well as hikers. It would fit the yellow classification in the city's plan.

In my original submission to the city I stated:
As an environmentalist and serious hiker and mountain biker my first and primary concern is that the trails be kept in their natural rugged state and be retained as natural surface single track trails.
The Trillium Woods is described in the city's plan as the most environmentally important and sensitive part of the South March Highlands. That being the case I might have expected possible trail closures in that area. Indeed the Trillium Woods Trail has begun to widen and my recommendation would be for mitigation measures to be taken to restore the trail to its natural single track state.

However the draft plan proposes the most environmentally damaging option for the Trillium Woods Trail, and that is to turn it into a widened hard packed gravel-stone dust pathway.

The only possible reason for that is because of it's proximity to development and houses. As an environmentalist I find this to be unconscionable.

The Beaver Pond

The area along the Beaver Pond will have pathways.

I stated in my original submission:
There has also been the possibility of wheelchair access pathways suggested. Despite the potential benefits of this, I do not wish to see the natural ruggedness and wilderness-like nature of the protected area compromised. One possibility is to build such a pathway around the “Beaver Pond”. This would also provide a place for casual walkers to enjoy the forest without ending up on the rugged natural trails in their high heels or sandals.
Kanata Lakes

The remaining protected Kanata Lakes lands on the other side of Goulbourn Forced Road will also have pathways.

It will be sad to see the eventual loss of the natural trails in the old Kanata Lakes system but due to it's proximity to development and housing, it's distance from the main natural rugged trail system, and the small amount of area left and the desire to provide a balanced mix of trails and pathways, this may be a reasonable place to put pathways. To be honest, I really do not want to see the loss of these natural rugged trails but I am trying to be balanced and open minded here.

The Hydro Cut and New Pathway

The Hydro Cut is unsustainable as it is, being a mud hole for much of the hiking and biking season. It is appropriate to turn it into a pathway.

I have no comments on the new pathway at the end of the hydro cut.

Second Line Extension and Bear Claw Trail

The Second Line Extension was a forest road, although it has started to narrow in sections. I have no objections to it becoming a pathway.

Bear Claw Trail is a different matter. It is a wonderful fun beginner to intermediate level mountain bike and hiking trail. It would fit the yellow classification in the city's plan.

While I can accept the need for some easy pathways to serve all members of the public. I think what has been provided, including giving up all the natural rugged trails in the old Kanata Lakes System, is sufficient and another wonderful natural trail should not be sacrificed.

Trail Closures

It would have been nice to have some documentation on the reasons for the trail closures, though one can speculate that some of it was done to rationalize the system and eliminate duplicate parallel trails.

Closure of Easier Trails: Rockhopper Jr., Rockhopper Extension and M-Line (and Widening Bridges on Inner and Outer Thigh)

I can only speculate that these trails are being closed as a form of trail rationalization as they are relatively short sections of trail and overall the bulk of the trail system remains. M-Line may indeed be untenable due to its proximity to Terry Fox Drive (when built). However it is unfortunate as there is a limited amount of beginner level trails in the system.

As a mitigating measure, to increase the amount of beginner-friendly trails, I would propose that the Inner Thigh and Outer Thigh loops be made more beginner-friendly by widening the bridges to 24 inches, or eliminating them. There will still be sections of trail that are not beginner-friendly but that is the nature of natural trails and it provides an incentive to try something harder. However, the bridges are particularly intimidating to beginners because of their length and their narrowness.

Closure of the Southwestern Section of Rock Hopper

The plan proposes to close part of Rockhopper Trail, turning what was a loop trail into a dead end. Unless there is significant environmental reason (and none was given at the public meeting when I asked) it does not make sense to turn a loop trail into a dead end. This proposed trail closure needs to be rethought and the trail restored to its original loop. Incidentally the section of trail that is being closed is the easiest section of the trail.

Multiple Trails Combined Into One

There are a number of trails leading to Outback (Garter Belt, Ridgetop, Annex, Pasture and Gateway, etc.) where there are sections of separate trails running parallel and close to each other. While each of these trail does provide different terrain and riding experiences they are not all necessary to provide access to that part of the forest and I assume their conversion into one trail is based on the principle of trail rationalization.

Former Dark Side Trails

A number of trails that existed on former private property that has just recently been added to the city owned lands have been off limits for a number of years and were known as the Dark Side. The plan does not propose to reopen these trails but rather to close them. It would be useful to know the reasons for this decision. Without knowing that I cannot really support or oppose that decision.

Winter User Conflicts

As a cross-country skier I know that winter is the time when there are potential trail user conflicts, particularly with walkers who walk on the ski tracks making big holes that make skiing difficult.

Snowshoers tend to make their own separate trails, but even if they do go over the ski trails, they just flatten them rather than punching deep holes, making it still possible to ski the trail without too much difficulty.

Mountain bikers, on the other hand, tend to avoid the trails when they are skiable, because of the difficulty riding (and the fact that they would prefer to be skiing when the trails are skiable). Mountain bilkers prefer windows of opportunity when there is a freeze after a thaw (before more snow falls) and the trails are hard and frozen making ideal conditions for biking with studded tires but lousy conditions for skiing.

Public Education

The final, but perhaps most important part of the plan, should be public education on environmentally friendly and sustainable trail use, including respect for other trail users - share the trail. The education campaign should stress that trail users should stay on the designated trails. As well it should encourage trail users to avoid wet muddy trails but advise them to use the centre of the trail, not go alongside and widen it, if they do need to go through wet muddy sections.

Public education should also address the winter user conflicts and how to avoid them (don't walk on the ski tracks).

Signage at the trail heads should include large trail maps on the signs along with responsible trail use guidelines. As well pamphlets with a map of the trails and the guidelines should be available.

The Public Consultation Process: Lack of Information

In my response to the city's presentation at the April 30, 2008 Open House I stated:
Afterwards, I immediately went to the City of Ottawa website to see if I could review the maps and other documentation. However, as is usual whenever I go to the City of Website to look for planning or development information, I found it to be woefully inadequate.

It would be very useful if the public could access more details and background information on the City of Ottawa website in order to make better informed comments and suggestions.
The response I received from the city on May 12, 2008 was:
I noted your comment on the web site and I agree that we need to get materials there as we proceed with the process so I will be working to get material posted as soon as possible.
However nothing was posted and only recently very sparse information was posted on the City of Ottawa website at the link below.

City of Ottawa - South March Highlands Conservation Forest Management Plan

None of the information or maps from the Open House or the recent presentation of the draft plan are available online. At the March 2, 2009 meeting I was assured again that they will look into making more information available on the website.

It is very difficult for a member of the public to participate meaningfully in this process without adequate information. In particular, not knowing any of the actual reasons for trail closures has left me having to speculate in preparing my response to the draft plan. This weakens the public consultation process, and some may argue renders it meaningless. I would not go that far but my ability to fully participate in the process has certainly been reduced by the lack of information available.

For more general comments see also:

Submission re: South March Highlands Conservation Forest Management Plan

The South March Highlands - Kanata’s Outdoor Wonderland

For information on mountain biking in Ottawa see:

Ottawa Mountain Bike Association Web Site.

2009-01-22

Why Mountain Biking Should Be Allowed on the Greenbelt Trails

Submission to the National Capital Commission Greenbelt Master Plan Review

By Richard W. Woodley, environmentalist, hiker, mountain biker, snowshoer, cross country skier, kayaker

The following statement, contained in an email from an NCC representative, dated May 12, 2006, makes it clear that the current NCC policy banning mountain biking on the Greenbelt trails is unenforceable.

We know that there is a lot of interest in off-road riding on Greenbelt hiking trails. On the other hand, section (16) of the NCC Traffic & Property Regulations states..."No person shall ride a bicycle on property of the Commission other than a driveway or on a bicycle path set aside by the Commission for the purpose...". While we have not actively tried to enforce this particular regulation, we do not condone the practice. There are long-term impacts on the trails and surrounding area, particularly rutting, trail erosion, trail widening as users veer off the designated route to avoid ruts and muddy surface, and destruction of adjacent vegetation. In the winter, we want to discourage bike riders who may travel across groomed ski tracks.
What is apparent, when one examines the facts, is that there are no legitimate reasons for banning mountain biking on the Greenbelt trails. In fact, there are numerous reasons why it should be allowed, and indeed encouraged.

There is a certain irony, some might say hypocrisy, for the NCC, an organization that is known for what I call the “NCCification” of trails, the flattening and widening of natural single track trails, and an organization that regularly uses heavy equipment and tractor-like lawn mowers on the trails, to claim that mountain biking damages the trails.

Even more than my desire to see the NCC adopt a policy of allowing mountain biking on the Greenbelt trails is my desire for them to adopt a policy of leaving all trails in their natural state and to do as little damage as possible to the environment when creating trails.

It is the creation of trails that has potential to do environmental damage, not the responsible use of them. Trails should be designed and built in a sustainable manner, a practice that interestingly enough has been developed and promoted by mountain bikers, and in particular the International Mountain Bicycling Association (IMBA).

Trails can be of great environmental benefit. First, by keeping trail users away from environmentally sensitive areas. Note that hikers are much more likely to go off the trail and do environmental damage to sensitive areas than mountain bikers are. Secondly, trails bring people into contact with the environment, learning to love and respect it and often becoming advocates for the environment.

People can be a great threat to the environment, the biggest impact being from development, bulldozing and paving it over, blasting and replacing forests and meadows with parking lots, buildings, and roads, a practice that the NCC has been known to be a party to.

On the other hand people hiking responsibly through the forest have no greater impact than deer or bears running through the forest, particularly when they are on a controlled trail system. The same applies to mountain biking where the scientific evidence indicates that hikers and mountain bikers and hikers have equivalent impacts on trails. See for example the reviews done by the International Mountain Bicycling Association and the New Zealand Department of Conservation.

The other argument against allowing mountain bikers on the Greenbelt trails is user conflicts.

In various places, including the Greenbelt, hikers and bikers regularly share the trails with each other with few problems. I can personally attest to never having had a conflict with hikers on the Greenbelt trails while riding them regularly (several times a week). I can also attest to hiking and mountain biking in the South March Highlands and always having other trail users treat me with respect, whether as a hiker or a biker.

The majority of outdoors persons considers themselves to be, and indeed are, environmentalists. The best way to raise environmental awareness is by getting people out into the environment, enjoying it and learning of it’s importance and the need to protect it. That is where the environmentalists that we need to fight the real threats to the environment - development and habitat destruction, are born.

Getting people out into the environment, onto the lakes and rivers and into the forests builds healthy lifestyles, and healthy lifestyles improve our health and reduces our health care costs. This is important at a time when obesity, and childhood obesity in particular, is at epidemic levels. We need natural spaces and trails to teach our children the benefits and enjoyment that can be had in the great outdoors. The National Capital Region is fortunate that we have a population that celebrates healthy lifestyles and rises up to challenge those that want to take our natural spaces and trails away from us. Allowing mountain biking on the trails is one more way to encourage people to get out and enjoy nature.

Young people need the type of challenges the outdoors can provide as an alternative to spending their time in a sedentary lifestyle centred on electronic devices, or other even worse, but seemingly exciting, activities like gangs and drugs. Youth can be attracted to these things by the very risks we want to protect them from. Outdoors activities such as rock climbing and mountain biking can provide exciting healthy risks that build character and a healthy body.

Mountain biking is the perfect activity to get young people active and out in the environment. It combines man and machine (or boy and machine) with a sense of adventure, all in a natural setting. The Greenbelt trails are the ideal location as many are closes to neighbourhoods and they have a wide variety of levels of riding difficulty and challenge.

The other very important reason for legitimizing the already existent practice of mountain biking on the Greenbelt trails is that it would provide an opportunity to undertake a public education program on environmentally friendly and sustainable trail use, including respect for other trail users - share the trail. The education campaign should stress that trail users should stay on the designated trails. As well it should encourage trail users to avoid wet muddy trails but advise them to use the centre of the trail, not go alongside and widen it, if they do need to go through wet muddy sections. It would be very difficult for the NCC to undertake an education campaign on the responsible way to do something that they officially prohibit.

A good place to start with trail education are the IMBA Rules of the Trail.

For more information on mountain biking see the International Mountain Bicycling Association (IMBA) website and the Ottawa Mountain Bike Association (OMBA) website.

There are, indeed, no legitimate reasons for prohibiting mountain biking on the Greenbelt trails.

2009-01-15

NCC Greenbelt Review and Mountain Biking: Part Three

This is the third part of a series of blog postings on the National Capital Commission's Greenbelt Master Plan Review as it relates to mountain biking. The last posting will be my personal submission on Mountain Biking in the National Capital Greenbelt.

This link will take you directly to the Review of the 1996 Greenbelt Master Plan.

Managing Recreation and Mountain Biking

In this post we will look at the NCC document entitled Managing Recreation as well as other information on their web site relating to NCC policies on trails, cycling and mountain biking.

The document Managing Recreation states:

Over 100 kilometres of trails have been developed for recreational use in the Greenbelt (skiing, snowshoeing, hiking and birdwatching), and the Greenbelt Pathway is under development with links to the recreational pathway system (in the Capital region), the Rideau Trail (Ottawa to Kingston) and the Trans Canada Trail (across Canada). A number of recreational facilities such as campgrounds, riding schools, municipal sports fields, golf courses and two leash-free areas for dog walking can also be found in the Greenbelt.

The Greenbelt Pathway

The Greenbelt Pathway is planned to be a continuous 56-kilometre recreational pathway that will provide a unique experience from Shirley’s Bay in the west to Green’s Creek in the east.

Its objectives are:

- to connect key visitor attractions and link with other pathways in Canada’s Capital Region
- to provide a unique rural experience along the Capital’s integrated Recreational Pathway Network
My understanding is that cycling is only officially allowed on the “recreational pathways” and not the “trails”. We will examine the document Biking Country to try and find a clear statement of that policy.

The document The Capital Pathway states:
Canada’s Capital Region is home to one of North America’s largest networks of cycling pathways — the Capital Pathway network. More than 170 kilometres of recreational pathways link superb natural areas, parks, gardens, museums and attractions. The paths are great for cycling and many other activities such as walking, jogging and in-line skating. Come and fill up on fresh air!
The Map of the Capital Pathway makes it clear that this only includes paved and hard packed surface pathways and not the natural trails in the Greenbelt.

The chart of recommended activities on the NCC Greenbelt Map indicates that “biking” is only recommended on the “pathways” and on none of the “trails”.

Nothing in the review documents that I have seen indicates that these specific policies are under review, but everything I have seen in the documentation so far has been very general.

The only reference on the NCC website to mountain biking seems to be the section on Mountain Biking in Gatineau Park.

So the clearest statement of current policy we seem to have is the email that we received from an NCC representative dated May 12, 2006:
We know that there is a lot of interest in off-road riding on Greenbelt hiking trails. On the other hand, section (16) of the NCC Traffic & Property Regulations states..."No person shall ride a bicycle on property of the Commission other than a driveway or on a bicycle path set aside by the Commission for the purpose...". While we have not actively tried to enforce this particular regulation, we do not condone the practice. There are long-term impacts on the trails and surrounding area, particularly rutting, trail erosion, trail widening as users veer off the designated route to avoid ruts and muddy surface, and destruction of adjacent vegetation. In the winter, we want to discourage bike riders who may travel across groomed ski tracks.
I will be watching for further information on the Greenbelt Master Plan Review to be posted on the NCC web site and for notices of public meetings and will report them on my blog. I will now begin drafting my personal submission on Mountain Biking on the Greenbelt Trails.

2009-01-14

NCC Greenbelt Review and Mountain Biking: Part Two

This is the second part of a series of blog postings on the National Capital Commission's Greenbelt Master Plan Review as it relates to mountain biking. The last posting will be my personal submission on Mountain Biking in the National Capital Greenbelt.

This link will take you directly to the Review of the 1996 Greenbelt Master Plan.

The Backgrounders and the Process

In this post we will look at the Backgrounders provided by the NCC on their web site.

These references to trails and cycling are found in the backgrounder entitled The Greenbelt.

It is a key recreational and tourist area. Over 100 km of trails within the Greenbelt pass through its conservation areas of Green’s Creek, Mer Bleue, Shirley’s Bay and Stony Swamp as well as through the Pine Grove and Pinhey Forests. Greenbelt trails for walking and cycling in the summer, walking, snow-shoeing and cross-country skiing in the winter, link to parts of the Trans Canada and Rideau Trails and the Capital Pathway Network.


Many people decided to leave the farms that were on poorer soil instead of leasing them back from the NCC. This prompted the NCC and the Government of Ontario to re-forest much of that farmland. The Pine Grove and Pinhey forests of today largely resulted from that initiative. By the 1970s, steps were taken to protect natural areas such as Mer Bleue and Stony Swamp. Walking and ski trails were created and the Greenbelt became recognized as an accessible oasis for outdoor recreation in the capital.
Note no details as to what trails “cycling” is allowed on are provided in this document.

These references are found in the backgrounder entitled The Master Plan. Again few details are provided.
As an example of its impact, the Master Plan directs how and where pathways should be built to provide a connected and varied experience for walking and cycling. The current Greenbelt trail system extends over 100 kilometres.
The backgrounder entitled The Update Process/The Review provides details on the review process time line.
What is the process for updating the Master Plan?

The process will consist of a number of steps that begin in 2008 and end in 2011.

Step 1: Research (Fall 2008 to Spring 2009)
This step will include a review of background information, site visits and discussions with a number of groups with a stake in the Greenbelt. These groups include all levels of government, residents, farmers, the business community and the general public. A Public Advisory Committee that will be established during this step will also be consulted. The public can also provide input through the NCC’s website.

The result of this step will be a common understanding of the current status of the Greenbelt.

Step 2: The Vision (Spring 2009 to Fall 2009)
During this step all involved parties, including the public, will participate to help improve the vision statement for the Greenbelt. The existing vision as set out in the 1996 Master Plan will serve as a starting point. There will be a national workshop and three public workshops in the eastern, central and western parts of the Greenbelt. The Public Advisory Committee and the interactive website will continue to play a part.

The result of this step will be a clear view of how the Greenbelt should look at least 50 years into the future.

Step 3: Concept Plans (Fall 2009 to Summer 2010)
This step involves developing what is called a “concept plan.” A concept plan is the first step in applying the vision to physical reality. It sets out principles and objectives. It describes the functions of different areas of the Greenbelt and sets the types of use that may occur on the lands throughout the Greenbelt. The concept plan will also set priorities and give direction for the Greenbelt’s long-term use and development. During this step two or three concept plans will be developed as options. Comment on these options will be obtained through discussions and meetings with stakeholders and the public. There will be three public workshops in the eastern, central and western parts of the Greenbelt. The Public Advisory Committee and the interactive website will continue to play a part.

The result of this step will be an evaluation of two to three options for making the vision for the Greenbelt a reality with a recommended land use concept plan.

Step 4: Sector Plans (Spring 2010 to Spring 2011)
The background data, vision and concept plan of the three previous steps will then direct revision of the 11 sector plans. A sector plan applies the Master plan to specific parts of the Greenbelt, such as Mer Bleue, Pinhey Forest or Conroy Pit. During this step the sector plans will be updated to ensure they reflect the revised direction of the new Master Plan. These options will be discussed with stakeholders and at public meetings. There will be three public workshops in the eastern, central and western parts of the Greenbelt. The Public Advisory Committee and the interactive website will continue to play a part.

The result of this step will be a renewed set of recommendations for how the Master Plan will be applied in specific areas of the Greenbelt.

Step 5: The Master Plan (Fall 2011)
During this step the final Greenbelt Master Plan will be prepared and approved. Individuals and groups interested in the Master Plan will be able to obtain copies of the final version, once approved.

The result of this step will be an updated National Capital Greenbelt Master Plan that will preserve and guide the Greenbelt in the future.

Although the evaluation process continues throughout the plan review, a Strategic Environmental
Assessment report will be completed at this stage. This assessment compares the proposed plan sections developed at each phase of the study against the guidance provided through the Plan for Canada’s Capital and against sound and established environmental principles.
In the next post we will look at the NCC document entitled Managing Recreation as well as other information on their web site relating to NCC policies on trails, cycling and mountain biking.

2009-01-13

NCC Greenbelt Review and Mountain Biking: Part One

I am starting a series of blog postings on the National Capital Commission's Greenbelt Master Plan Review as it relates to mountain biking. This will be the first posting in that series. The last posting will be my personal submission on Mountain Biking in the National Capital Greenbelt.

This link will take you directly to the Review of the 1996 Greenbelt Master Plan.

Just as an aside, an interesting thing I discovered in starting this review is that the airport is part of the greenbelt. And I thought including a golf course as part of the Kanata Lakes environmental lands was pushing the envelope. Do they paint the runways green.

The NCC's current policy on mountain biking on the Greenbelt Trails was expressed this way in an email sent to us, dated May 12, 2006:

We know that there is a lot of interest in off-road riding on Greenbelt hiking trails. On the other hand, section (16) of the NCC Traffic & Property Regulations states..."No person shall ride a bicycle on property of the Commission other than a driveway or on a bicycle path set aside by the Commission for the purpose...". While we have not actively tried to enforce this particular regulation, we do not condone the practice. There are long-term impacts on the trails and surrounding area, particularly rutting, trail erosion, trail widening as users veer off the designated route to avoid ruts and muddy surface, and destruction of adjacent vegetation. In the winter, we want to discourage bike riders who may travel across groomed ski tracks.
Hopefully this review process will allow the NCC to become more enlightened about the environmental impacts of mountain biking and the benefits of allowing mountain biking on the Greenbelt Trails.

Greenbelt Master Plan Summary (1996 Master Plan)


The first thing I looked at in my review of the NCC documents on the current Greenbelt Master Plan Review was the Greenbelt Master Plan Summary (1996 Master Plan).

In reviewing the 1996 Master Plan Summary I found references to trails, including this reference:
What is the Greenbelt?

As the Capital’s principal rural landscape, the Greenbelt offers a welcome breathing space between the Capital’s inner and outer urban areas on the Ontario side of the Ottawa River. The Greenbelt is a crescent shaped mosaic of farms, forests and wetlands complemented by ski and hiking trails and dotted with federal and private institutions. Its rural character, along with the wilderness setting of Gatineau Park and the Capital’s many riverside parks and urban green spaces, creates a uniquely Canadian setting for the Capital that symbolizes the vast and diverse landscapes of this great nation. It is the only greenbelt in the world that is publicly owned in its entirety, and it helps make Canada’s Capital one of the most beautiful and enjoyable capitals in the world.
A search for references to cycling or biking found no references except one reference to providing bicycle parking:
Infrastructure Corridor

This designation identifies lands that are used to move people, services and goods through the Greenbelt without fragmenting valuable cultivated or natural areas. Appropriate uses include roads, transitways and sewers,water mains and natural gas pipelines. Infrastructure such as hydro lines will be as unintrusive as possible, and public access to the Greenbelt will be improved via such facilities as bicycle parking or farm produce stands at transitway stations. Most infrastructure corridors or will be owned by levels of government other than federal.
Obviously, the Master Plan requires updating to take into account the extensive interest in cycling and mountain biking in the National Capital Region.

Announcements

The next thing I examined were the announcements relating to the review.
The revision will be done in two phases. Phase I will run from now through to the summer of 2010 and will focus on developing a comprehensive assessment, a vision statement and a land-use concept. Phase II will span from the spring of 2010 through to the fall of 2011 and will help to specify work needed in each area, including the development of policy statements, designations of land use, recommendations on the National Interest Land Mass (NILM), and requirements for guidelines and design. Once these are established, the final draft of the Master Plan can proceed.

The review process places particular emphasis on consulting the public in the very early stages. Other partners and stakeholders to be consulted include the Public Advisory Committee, affected municipal, provincial and federal bodies and various interest groups. This extensive consultation will complement and inform activities of the NCC’s existing groups of experts including NCC staff, its Advisory Committee on Planning, Design and Real Estate (ACPDR) and the NCC Board.
The NCC site also included this statement:
Participate

The NCC is encouraging the public and other levels of government to participate in planning the future of the Greenbelt. There will be extensive public consultations and workshops during the process of the updating of the Greenbelt Master Plan (see “The Update”).

During Step 1, 2, 3 and 4 of the process there will be numerous opportunities for members of the public to participate and contribute to the review. Those opportunities will be advertized and posted well in advance on this website. As the study proceeds, members of the public can share their views on this website.
So far the only opportunity provided on the web site, that I could find, for the public to participate is a survey form here:.

An email address for more comprehensive submissions does not seem to be provided, though perhaps one could send a submission to info@ncc-ccn.ca and request that your submission be forwarded to the appropriate person.

The Backgrounders

Coming in the next blog posting.

2009-01-07

Bracebridge-Gravenhurst-Muskoka Mountain Biking Trails

The following is a document I put together in preparation for a possible mountain biking vacation this summer. I have not been to any of these places. The information below is based on Rider Mel's Guide and Internet research.

If anybody wants a printer friendly PDF version with clickable links or a GPX file of the waypoints on the maps please email me at richardw.woodley@gmaii.com

Click on maps to view enlarged versions

Muskoka – Bracebridge Area Mountain Biking Sites

Core Area Trails


Buck Wallow

Fee: $7 day
Location: near Gravenhurst
Overview: 20 km trails, intermediate to advanced, very well maintained
Directions: Take Hwy 400 from Barrie north to Hwy 11, Hwy 11 north to Gravenhurst Parkway (exit 175) and follow briefly to Reay Rd, turn right and look for signed parking area on left, other side of road from KOA campground.
More info, map: Rider Mel's Guide
Crankarm: Buckwallow Trail Map
Mountain Biking at Buckwallow Cycling Centre - Canada Trails

Porcupine Ridge

Fee: $2 day
Location: Santa's Village, Bracebridge
Overview, 20 km trails, intermediate to advanced, “northern shield riding”
Directions: Take Hwy 400 from Barrie north to Hwy 11, Hwy 11 north to Hwy 118, Hwy 118 west to Bracebridge., go through the first set of traffic lights and turn left at Santa's Village Road, continue about 5 km. Porcupine Ridge is on the right hand side of the road, other side of road from Santa's Village.
More info, map: Rider Mel's Guide
Ecclestone Cycle: Porcupine Ridge Trail Map
Mountain Biking in Porcupine Ridge Trails - Canada Trails

Bracebridge Resource Management Centre

Fee: none indicated
Location north of Bracebridge (8 km)
Overview: 15 km trails, multi-use, easy to intermediate. double track loops
double track loops with interconnecting single track over rolling terrain in a forested area.
Directions: Take Highway 11 N. from Bracebridge past the turn off for Highway 117. The entrance is on the east side of Highway 11, 2.4 km north of High Falls/Hwy 117 bridge. The entrance is clearly marked by a large sign.
More info:
Doitinmuskoka.com - Bracebridge Resource Management Centre
Tourism Bracebridge - Muskoka Trails

Devils Gap

Fee: none indicated
Location: west of Gravenhurst
Overview; 6 km, 40 km, singletrack and fire roads, all skill levels. Great photo opportunities such as beaver dams, expanses of Canadian Shield, vast marshland and open meadows.
Directions: Trailhead is found 6.9 km west of Gravenhurst on Hwy 169. Turn left onto Snider's Bay Road… travel 1.3 km to Muriel Crescent to the Trailhead on the right. (look for the pole in the ground which starts the trail OR continue just a few seconds further and find parking on the right, open rock area great for parking, 2nd entrance to the trail there)
More info:
MTBR: Devils Gap Trail Reviews
Gravenhurst Hiking Trails

Torrance Barrens

Fee: Free
Location: Between Gravenhurst and Torrance
Overview: 15 km, easy, lunar landscape, dark sky reserve
Directions: Take Muskoka Road 169 north from Gravenhurst, Turn south on Southwood Road (Muskoka Road 13) and travel 7 kilometres to the Torrance Barrens sign. Park on the flat rock. The trail is marked with stone cairns, white marks on rocks and metal signs.
More info, map: Rider Mel's Guide
Ecclestone Cycle: Torrance Barrens
Trail Peak: Torrance Barrens

Peripheral Area South Trails


Hardwood Hills

Fee: $12.50 day
Location: near Edgar
Overview: 50 km trails, easy to intermediate, quick drying trails
Directions: Take 400 extension North from Barrie, north of Barrie, take first exit (exit #111) onto Forbes Rd (County Road 11), turn left at stop sign, follow Forbes Rd. NE for 10 km, Hardwood Ski and Bike will be on the left hand side of the road.
More info, map: Rider Mel's Guide
Hardwood Hills Ski and Bike
Mountain Biking at Hardwood Hills - Canada Trails

Eight Wander, Seventh Heaven

Fee: free
Location: near Edgar, east of Hardwood Hills
Overview: single track, mixed reviews
Directions: Oro/ Medonte, Near Horseshoe Valley (sugarbush).Trails located in between Horseshoe Valley Road (south of) and Old Barrie Road (north of), in between 2nd and 8th lines of Oro/Medonte.Minutes past Hardwood Hills on Old Barrie Road.
More info, location map:
MTBR: 8th Wander, 7th Heaven Trail Reviews

Pineridge Loop

Fee: free
Location: near Coulson
Overview: 13 km, intermediate
Directions: Take 400 north from Barrie to exit 117 East, turn right on Horseshoe Valley Rd. and look for the Pineridge signs just past Horseshoe Heights
More info: Rider Mel's Guide

Peripheral Area East Trails


Haliburton Forest

Fee: $15 per day
Location: by Kennisis Lake, near Algonquin Park
Overview: 100kms trails, , 300km of MTB and wilderness trails, easy to advanced note, includes wolf centre, some negative comments on Dirt world) see last link)
Directions: At West Guilford cross the bridge, and take County Road 7 for approximately 20 kilometres (12 miles) to the Base Camp. For
More info: Rider Mel's Guide
Haliburton Forest & Wildlife Reserve
Mountain Biking at Haliburton Forest - Canada Trails
Dirtworld: Haliburton Forest Mountain Bike Trail

Sir Sams

Fee: none indicated, (Half Day: $8.95
Full Day: $12.95 at Ski Hill site)
Location: close to Sir Sams Ski Hill near Eagle Lake
Overview: intermediate to advanced, fast ride with some moderate technical challenges. (From Sir Sams Ski Hill website: We have been busy mapping out and cutting Mountain Bike Trails to be open for Summer 2009. (Not certain if Ski Hill is taking over all trails)
Directions: From the town of Eagle Lake,go through Sir Sams Ski Hill parking lot to Deer Lake Dr. Several trails lead off the road marked with orange.
More info:
JaggedPath: Sir Sams
SirSams.com - Sir Sam's Ski Area
SirSams.com - SirSams.com - Mountain Bike Trails and Rentals

Silent Lake Provincial Park

Fee: park admission fee
Location: 24 km south of Bancroft
Overview: 6, 12 and 19km trails, intermediate to advanced,
well marked, and operate from the 2nd Friday in May until Thanksgiving Monday, trails have extremely muddy portions during the spring to mid June season.
Directions: The park is 25 km southwest of Bancroft on Highway 28
More info, map: Rider Mel's Guide
JaggedPath: Silent Lake Provincial Park
Silent Lake Provincial Park
Mountain Biking at Silent Lake Provincial Park - Canada Trails

Peripheral Area West Trails


Three Stage

Fee: none indicated
Location County Road 19 south west of Collingwood.
Overview: 40 (80?) km, intermediate to advanced
Directions: ???

(Rider Mel's Guide)
From Main St. in Collingwood go west to the Hwy 26 intersection and turn LEFT. Go to Sixth Street and turn RIGHT. Go to Osler Bluff Rd. (Hwy 19) and turn LEFT. Stay on 19 turning RIGHT onto 9TH sideroad. It will head up the escarpment. Turn LEFT at the 2ND line and follow the rough road to the dead end. Pick up the 1-track to the right of the parking area (on the cross roads) and follow the map.

(alternativewheels.com)
From the west take Grey Rd. #2 south to Grey Rd #19, then east to the Collingwood 4/5 line. Go south to the 6/7 sideroad, then east to the intersection of the 2/3 line. The road basically ends here and you can park off to the side and access the upper entrance. Riders coming from the east may prefer to use the lower parking lot on Grey Rd. #31 near the intersection of the Collingwood townline.

(out-there.com)
From the 400 follow the 25 passed Collingwood to the 19. Take the 19 south and watch for the Bruce Trail on the right side of the road. You'll find an unnamed road across from this on the other side of the street which will lead you to the small parking area and the entrance to the trails.

More info: Rider Mel's Guide
Mountain Biking Central Ontario North
Crankarm: 3 Stage
Mountain Biking @ Three Stage May 2004 (photos)
Jolley's Alternative Wheels - Three Stage

Loree Forest

Fee: free
Location: near Victoria Corners
Overview: 8 km, beginner, short flat singletrack, great view of Collingwood and Georgian Bay
Directions: From Victoria Corners on County Road 2 take Sideroad 21 for approx 4 km, parking area is on right, trail entrance on left.
More info: Rider Mel's Guide
http://www.alternativewheels.com/rides/mtb.php#24
http://www.out-there.com/ton02mtb.htm
Jolley's Alternative Wheels - Loree Forest
Mountain Biking Central Ontario North

Kolapore Uplands

Fee: none indicated
Location: Kolapore, below Lake Huron
Overview: 50 Km, intermediate to advance, forested, The map is available at the Ravenna General Store 6km north of the parking lot
Directions: The main entrance is approximately 6 km south of Ravenna on Grey Road 2, 15 km north of County Road 2 and County Road 4.

More info: Rider Mel's Guide
Mountain Biking at Kolapore Uplands Trails - Canada Trails
Mountain Biking Central Ontario North
Kolapore Uplands Wilderness Ski Trails


For Future Reference: Further East Trails, Bruce Peninsula etc.
Jolley's Alternative Wheels - Mountain Bike Trails
Mountain Bike The Bruce